Ongoing projects

  • Print

 


MEASUREMENTS from June 2002 to March 2004


These measurements were performed in the nominal measurement scenario that had originally been  planned.

The characteristics distinguishing the June 2002 - March 2004 measurements from the subsequent measurements are listed below:

Type
Parameters

Spectral resolution
0.025 cm-1 (defined as spacing between independent measured spectral points)
Vertical sampling grid


# of spectra / scan
3 km step               5 km step         8 km step
6-42 km                  42-52 km          52-68 km


17
Horizontal sampling grid
550 km