The results of the tests
performed with ORM during the Commissioning
Phase of MIPAS are described in the following TNs.
The results of the tests performed with ORM during the Commissioning
Phase of MIPAS are described in the following TN.
TN Cal. Val. Results,
first
part;
TN Cal. Val. Results,
second
part.
The presentation of the ORM team at EGS (Nice, April 2003) can be
downloaded here.
We are aware of the following problems in MIPAS Level 2 products that
are currently distributed by ESA:
the thresholds for convergence criteria are not very stringent;
the values of the retrieved profile at the borders of the retrieval
range are affected by the errors due to the assumption of the profile
outside the retrieval range;
oscillations are present in the retrieved profiles.
Work is in progress in order to reduce the effects of these
problems.