Near real
time analysis was stopped on March 2004.
A complete re-analysis of measurements from July 2002 to
March 2004 was
performed with V4.61 of ESA operational Level 2 processor
[Raspollini et al, 'MIPAS level 2 operational analysis', ACP, 6,
5605-5630, 2006].
This
quite extensive MIPAS database (full
resolution and old measurement scenario), has passed a
co-ordinated validation process [see papers in Special
Issue ‘MIPAS:
potential of the
experiment, data processing and validation of the results’,
Atmospheric Chemistry
and Physics, 2007].
The
processing of the measurements from January 2005 on
has required a
change in both the algorithm [Ceccherini et al., 'Technical note:
Regularization performances with the error consistency method in the
case of retrieved atmospheric profiles', ACP, 7, 1435-1440, 2007] and
in the auxiliary data.
A
preliminary set of Level 2 data relative to these
measurements is now
available for validation purposes.
Results of analysis on these preliminary set are summarised in
[P. Raspollini et al., 'Overview of MIPAS operational products',
ENVISAT Symposium 2007, Montreux], where a
comparison with the measurements in the old operation mode in term of
precision
and vertical resolution is performed.
|